- ProjectView: title is now a plain <h1>, no longer inline-editable
(dropped titleDraft/saveTitle/patchProject and the input markup --
nothing else used patchProject).
- ProjectConfigureView: new 'Project name' section above 'Statuses',
a small PATCH /api/projects/:id form. On success it also calls the
projects store's fetchProjects(), since the dashboard grid and the
sidebar's project dropdown read from that store and otherwise
wouldn't pick up the new name (or the project's new alphabetical
position) until some unrelated reload.
- style.css: dropped the now-dead .project-head__title input rules
(both views render a plain heading now); .project-head__title gains
word-break so a long static title still wraps instead of overflowing.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
New /projects/:id/configure view, linked from a new 'Configure' item on
the project view's Manage menu.
Backend:
- CardStatusRepository/CardStatusController gain full CRUD: create
(appended at the end), reorder (dense positions, like card
ordering), and delete.
- Deleting a status with cards attached is rejected with 409 and
error.details.card_count, rather than hitting the existing FK
RESTRICT constraint -- retrying with { reassign_to: <status id> }
moves those cards to that status first (CardRepository::
reassignStatus, appended after the destination's existing cards)
and deletes in one transaction (CardStatusRepository::transaction,
shared PDO connection across repositories).
- The last status in a project can't be deleted, since a project card
is required to have one.
- Routes: POST/DELETE .../statuses(/:id), PUT .../statuses/order.
- 14 new CardStatusTest cases covering all of the above.
Frontend:
- ProjectConfigureView.vue: header (title, back-to-project link, the
shared Manage menu) + a vuedraggable status list (reorder persists
the whole new order) with a delete button per row and an add-status
form. A row's plain delete either succeeds immediately or, on 409,
opens a modal to choose a different status before retrying the
delete with reassign_to.
- Extracted ProjectManageMenu.vue (the Manage dropdown + delete-project
modal) out of ProjectView so both views share it; it now also has a
Configure link (hidden on the configure page itself).
- ApiError gains a cardCount getter (details.card_count), mirroring
the existing retryAfter getter.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
- Remove the '<- All projects' link at the top -- the sidebar's
Dashboard link already covers that.
- Remove the description textarea and all of its state/save logic
(descriptionDraft, saveDescription, patchProject's description
field); the backend field and API are untouched.
- Drop .project__chrome's 42rem max-width, which existed only to keep
the now-gone description prose readable. The header (title + Manage
menu) now spans the full wide-layout width, so Manage sits at the
true top right instead of a narrower centred column.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
- DashboardView: a "New project title" form now sits directly below the
project grid (creating one stays on the dashboard -- the grid and the
sidebar dropdown pick it up via the shared projects store, no navigation).
- AppSidebar: the per-project RouterLink list is replaced by a <select>. It's
a v-model-bound writable computed (selectedProjectId): the getter tracks
route.params.id so it reflects whichever project is open, the setter
router.pushes to the chosen one -- so it doubles as a project switcher from
anywhere, not just a picker from the dashboard. Removed the now-unused
.sidebar__link--project/.sidebar__projects/.sidebar__form CSS; added
.sidebar__select, and .form--new-project back for the dashboard form.
- ProjectView: activeTab now initialises to 'kanban' instead of 'all'. The
tabs array (and so the tab bar's DOM order, All tasks first) is untouched --
only the default selection changed.
Verified via headless Chrome: sidebar has no per-project links (a <select>
listing both projects instead); the new-project form follows the grid and
creating from it stays on /dashboard while the grid and dropdown both update;
selecting a project in the dropdown navigates there and the dropdown reflects
it once there; a project opens on Kanban with the tab bar still reading "All
tasks, Kanban" in that order.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
A card either sits in its owner's inbox (project_id AND status_id both NULL)
or belongs to exactly one project with a status in it (both set) -- enforced
by a CHECK constraint, never one without the other. The inbox is global to a
user now, not per-project: cards can move from a project into the inbox and
back into any status column of any project.
Backend
- migrations/009: rebuilds `cards` (SQLite can't relax NOT NULL / add a CHECK
in place) with a nullable project_id, a new owner_id (cards need direct
ownership once they can have no project), and the CHECK constraint. Cards
that had no status (the old per-project inbox) move to the new global inbox.
status_id's FK is now ON DELETE RESTRICT, not SET NULL -- nulling it alone
would violate the invariant, and there's no status-delete endpoint anyway.
- CardRepository: "column" is now (owner_id, project_id, status_id); every
method that dealt with a project's columns is generalised to also cover the
inbox and cross-project moves (orderColumn, idsInColumn, repack, ...).
- CardController/routes: single-card and ordering routes move to global,
since a card may have no project to nest them under --
GET/PATCH/DELETE /api/cards/{id}, PUT /api/cards/order (body now takes
project_id + status_id, both null for the inbox). New GET/POST
/api/inbox/cards. PATCH no longer accepts status_id -- moving a card, in or
out of a project, is exclusively PUT /api/cards/order now. A card created
directly in a project (POST /api/projects/{id}/cards) lands in its first
status, since a project card can't have no status.
- Tests: ProjectTest/CardStatusTest updated for the new routes; CardOrderTest
rewritten with full inbox/cross-project coverage. 57 tests pass.
Frontend
- New stores/inbox.ts (the global inbox) and lib/cardOrder.ts (the shared
PUT /api/cards/order call, used by both the sidebar and a project's board).
- AppSidebar: an Inbox section under the project list -- a vuedraggable list
in the same "kanban" drag group as every project's kanban columns, so a
card drags straight from the sidebar into whichever project is open, or
back out. (The empty-inbox state needed a real bugfix: it wasn't rendering
a <draggable> at all, so there was nowhere to drop a card back into an
empty inbox.) A drop reloads the inbox and, if a project is open, its cards.
- ProjectView's kanban board drops its synthetic Inbox column -- just the
real statuses now.
- DashboardView simplified to a plain grid of project tiles (name + card
count); its per-project "New" section is gone, since a project card can no
longer have no status.
- stores/cards.ts: patch/remove move to the global /api/cards/{id} routes.
Verified end-to-end against the rebuilt container (existing per-project-inbox
cards correctly migrated to the global inbox, 0 invariant violations) and the
dev server via headless Chrome: sidebar inbox -> project A "To do" -> back to
inbox -> project B "Done", full journey confirmed via the API at each step.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
New --inbox-bg token (light and dark) applied via .kanban__col--inbox so the
inbox reads as distinct from "To do" / "Doing" / "Done".
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>
Statuses
- Migration 006: card_statuses table (project-scoped) and cards.status_id, a
nullable FK with ON DELETE SET NULL. Every new project is seeded with
"To do" / "Doing" / "Done"; GET /api/projects/{id}/statuses lists them.
- New cards have no status -- they sit in an "inbox" until moved.
Project view
- Full-width and tabbed: "All tasks" (a flat list, sorted by name
case-insensitively) and "Kanban" (Inbox plus one column per status).
- Drag a card within or between columns to reorder / restatus; the Inbox
column has its own name + Add form.
Ordering
- Migration 007: `position` is now a dense 0..n-1 rank within a
(project_id, status_id) column, not a project-wide order. New composite
index idx_cards_project_status_position; existing rows re-ranked.
- PUT /api/projects/{id}/cards/order takes { status_id, card_ids } and sets one
column's contents and order, re-parenting moved-in cards and re-packing their
source column in a single transaction. PATCH status_id appends the card to the
end of the destination column.
58 phpunit tests pass; the frontend type-checks and builds.
Co-Authored-By: Claude Sonnet 5 <noreply@anthropic.com>